| Abstract: | Based on the distribution of coal mines in the region; this paper analyzes and optimizes the geological stratification; well bore structure; trajectory optimization design; friction torque; etc. of the Sudong block to achieve the maximum displacement and explore the optimal solution (displacement; horizontal section length) of gas and coal resources utilization under different natural gas development modes. Based on the concept of co-production of coal and gas; the parameters such as drilling deflection point and well trajectory of different well types (vertical/fixed well; horizontal well) are optimized to achieve the optimal displacement and horizontal section length. When the number of construction wells in the directional well group is more than 3; the "fishbone" pre-section shall be carried out; and the active separation shall be carried out to reserve the trajectory anti-collision space for the subsequent construction wells. If the track trend of the vertical well section continues to the direction of the derrick gate (within ± 30°); effective corrective measures shall be taken in time to avoid causing difficulties to the anti-collision construction of the subsequent wells. The arrangement of well groups should take into account the needs of roads and optimization of well trajectory; and the impact of displacement in front of target on construction. The maximum displacement of directional well groups can be 1300 meters. During the overall design; the construction sequence of each well should be arranged. It is recommended to construct the well with large horizontal displacement and shallow deflection point first; and design the direction of the rear gate. The design direction of the front gate is to drill the well and vertical well with small horizontal displacement and deep deflection point. The middle well of the reserved coal pillar of the horizontal well is used as the wellhead. Considering the offset distance; collision avoidance and obstacle avoidance; the maximum horizontal displacement can be simulated. The same well pad can be arranged with four three-dimensional horizontal wells with an offset distance of less than 500 and a horizontal section of less than 900 meters; and two two-dimensional horizontal wells with a horizontal section of less than 1200 meters. |
| Keywords: | Gas co-mining; Safety Coal Pillar; Maximum Displacement; Longest Horizontal Section |
| DOI: | 10.57237/j.cse.2023.03.003 |
| [1] | 张遂安. 采煤采气一体化理论与实践 [J]. 中国煤层气, 2006; 11 (2): 14-15. |
| [2] | 刘桂华. 合理留设保安煤柱的探讨 [J]. 矿山测量, 1989; 4 (1): 10-11. |
| [3] | 秦永和, 付胜利, 高德利. 大位移井摩阻扭矩力学分析新模型 [J]. 钻采工艺; 2006; 11 (2): 62-63. |
| [4] | 范光第, 黄根炉, 李绪锋, 等. 水平井管柱摩阻扭矩的计算模型 [J]. 钻采工艺; 2013; 20 (2): 65-68. |
| [5] | 张峰. 煤层气井钻井工艺分析及优化建议 [J]. 西部探矿工程, 2021; 33 (8): 60-61+64. |
| [6] | 刘曰武, 刘畅, 丁玖阁.钻井式煤炭地下气化技术的发展及关键力学问题 [J]. 力学与实践, 2021; 43 (1): 1-12. |
| [7] | 张娜. 钻井技术在非常规油气田中的应用研究 [J]. 中国石油和化工标准与质量, 2020; 40 (22): 175-177. |
| [8] | 杨甫, 段中会, 马东民, 等.煤炭地下气化技术进展 [J]. 科技导报, 2020; 38 (20): 71-85. |
| [9] | 李国红. 浅谈煤层气钻井过程中的储层伤害与保护 [J]. 价值工程, 2019; 38 (28): 14-15. |
| [10] | 杨慧. 钻井技术在非常规油气田中的研究与应用分析 [J]. 信息记录材料, 2018; 19 (12): 105-106. |
| [11] | 张全盛, 和喜军. 煤层气井储层保护钻井工艺分析 [J]. 工程建设与设计, 2020; 12 (13): 202-204. |
| [12] | 霍轩, 桑秀夫, 王林, 等. 煤层气井储层保护钻井工艺分析[J]. 云南化工, 2018; 45 (5): 150. |
| [13] | 李东民. 中国煤层气钻井技术现状及发展趋势探析 [J]. 中国石油和化工标准与质量, 2017; 37 (23): 191-192. |
| [14] | 颜培风. 煤层气储层保护钻井液技术探讨 [J]. 化工管理, 2015; 12 (33): 112. |
| [15] | 郭林霞. 煤层气钻井工程风险及监控研究 [D]. 中国矿业大学 (北京), 2009. |
We invite active, qualified and high profile scientists and researchers to join as Editorial Board Members.
Join UsScholars with a strong interest in reviewing are invited to join the reviewer panel to ensure the quality of the research to be published.
Join Us